VP of Data Center Construction Salary in Santa Fe, NM
This is the Data Center Headhunters salary guide.
BLS does not measure VP of Data Center Construction as its own occupation, so this page uses Construction Managers (SOC 11-9021, broader occupation). The median annual wage in Santa Fe, NM was $106,310 (BLS, May 2025), and the middle half earned $85,490 to $122,760. That is $8,680 below the national median of $114,990.
This is what we do all day: recruit data center professionals.
Broader occupation
Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.
Santa Fe, NM
| Point | Annual wage | Meaning |
|---|---|---|
| 10th percentile | $72,480 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $85,490 | 25% earned less than this. |
| Median | $106,310 | Half earned less, half earned more. |
| 75th percentile | $122,760 | 75% earned less than this. |
| 90th percentile | $136,750 | 90% earned less than this. |
| Mean | $109,000 | Average wage. |
| Point | Hourly wage | Meaning |
|---|---|---|
| 10th percentile | $34.85 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $41.1 | 25% earned less than this. |
| Median | $51.11 | Half earned less, half earned more. |
| 75th percentile | $59.02 | 75% earned less than this. |
| 90th percentile | $65.75 | 90% earned less than this. |
| Mean | $52.41 | Average wage. |
United States
| Point | Annual wage | Meaning |
|---|---|---|
| 10th percentile | $69,690 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $88,550 | 25% earned less than this. |
| Median | $114,990 | Half earned less, half earned more. |
| 75th percentile | $151,640 | 75% earned less than this. |
| 90th percentile | $189,440 | 90% earned less than this. |
| Mean | $124,360 | Average wage. |
| Point | Hourly wage | Meaning |
|---|---|---|
| 10th percentile | $33.5 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $42.57 | 25% earned less than this. |
| Median | $55.28 | Half earned less, half earned more. |
| 75th percentile | $72.91 | 75% earned less than this. |
| 90th percentile | $91.08 | 90% earned less than this. |
| Mean | $59.79 | Average wage. |
What BLS wages cover: OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. These are straight-time gross wages, not pure base salary or total compensation. Discuss per diem, travel and relocation separately. BLS pay-term definitions.
Employment: 90. Location quotient: 0.61.
Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. SOC 11-9021 Construction Managers, Santa Fe, NM. Download metropolitan data (ZIP).
Pay relative to all occupations
| Measure | Value |
|---|---|
| This occupation, median | $106,310 |
| All occupations (SOC 00-0000), median | $48,710 |
| Relative wage | 2.18 times |
A ratio of 1.00 means the same median as all workers in the area. It is arithmetic on two BLS medians, not a BLS statistic.
Change since the prior BLS release
| Reference period | Median |
|---|---|
| May 2024 | $88,820 |
| May 2025 | $106,310 |
| Difference | +$17,490 (+19.7%) |
Two published BLS values, shown as released. Not annualized, not adjusted for inflation, and BLS metro boundaries and survey panels can differ between releases.
What is inside the BLS pay figure
For construction and commissioning hires, separate expense reimbursements and overtime from straight-time pay. Check a project bonus on its actual terms. Guaranteed pay and production incentives count in BLS wages; discretionary nonproduction bonuses do not.
| Component | In the BLS figure? | Note |
|---|---|---|
| Base rate and guaranteed pay | Included | BLS counts the "base rate" and "guaranteed pay". |
| Production and incentive pay | Included | BLS counts "incentive pay including commissions and production bonuses". |
| On-call waiting or availability pay | Left out | BLS excludes payment for time spent awaiting a call to work, not ordinary wages for hours actually worked. BLS on-call pay definition. |
| Overtime pay matters here | Left out | BLS excludes "overtime pay". Straight-time pay only. |
| Shift differentials | Left out | BLS excludes "shift differentials", so night and weekend premiums are not in the figure. |
| Project-completion and discretionary bonuses matters here | Depends on the terms | Guaranteed pay and production incentives are included. Discretionary nonproduction bonuses are excluded. Check how the payment is defined. |
| Per diem, travel and relocation matters here | Left out | BLS does not name these as wages. They are expense reimbursements and are not in the figure. |
| Benefits and employer costs | Left out | BLS excludes "employer costs for supplementary benefits". |
Nearby and other areas
- VP of Data Center Construction in Washington-Arlington-Alexandria, DC-VA-MD-WV
- VP of Data Center Construction in Dallas-Fort Worth-Arlington, TX
- VP of Data Center Construction in Phoenix-Mesa-Chandler, AZ
- VP of Data Center Construction in Atlanta-Sandy Springs-Roswell, GA
- VP of Data Center Construction in Columbus, OH
- VP of Data Center Construction in Chicago-Naperville-Elgin, IL-IN
- VP of Data Center Construction in San Jose-Sunnyvale-Santa Clara, CA
- VP of Data Center Construction in Portland-Vancouver-Hillsboro, OR-WA
- VP of Data Center Construction in New Mexico (state)
- All roles in Santa Fe, NM
- VP of Data Center Construction nationally
Hiring Market Brief
A one-page brief for VP of Data Center Construction in Santa Fe, NM: BLS pay, mapping and caveats.
Hiring VP of Data Center Construction in Santa Fe, NM?
Pay is one input. Scope, license and travel decide whether the person says yes.