Data Center
Headhunters
Call 305-306-4829Start a Search

VP of Data Center Construction Salary

This is the Data Center Headhunters salary guide.

BLS does not measure VP of Data Center Construction as its own occupation, so this page uses Construction Managers (SOC 11-9021, broader occupation). The median annual wage in the United States was $114,990 (BLS, May 2025), and the middle half earned $88,550 to $151,640.

This is what we do all day: recruit data center professionals.

Broader occupation

Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.

National pay range

Median $114,990P10 $69,690P90 $189,440
Construction Managers, United States, annual wages
PointAnnual wageMeaning
10th percentile$69,69010% of workers in this occupation and area earned less than this.
25th percentile$88,55025% earned less than this.
Median$114,990Half earned less, half earned more.
75th percentile$151,64075% earned less than this.
90th percentile$189,44090% earned less than this.
Mean$124,360Average wage.

What BLS wages include: base pay plus any guaranteed or production-based incentive pay. What they leave out: overtime, discretionary bonus, benefits, per diem and relocation.

Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. SOC 11-9021 Construction Managers, United States. View this release at BLS.

Pay relative to all occupations

Median for this occupation divided by the all-occupations median, same area, same annual basis
MeasureValue
This occupation, median$114,990
All occupations (SOC 00-0000), median$50,980
Relative wage2.26 times

A ratio of 1.00 means the same median as all workers in the area. It is arithmetic on two BLS medians, not a BLS statistic.

Pay in industries that hire this occupation

National employment and pay by BLS industry, BLS, May 2025
Industry (BLS name)NAICSEmploymentShare of occupationMedianP25 to P75
Nonresidential Building Construction23620092,59024.3%$126,690$98,640 to $160,330
Building Equipment Contractors23820047,36012.5%$109,990$91,550 to $140,570
Utility System Construction23710024,6806.5%$120,440$96,810 to $153,320
Electrical Contractors and Other Wiring Installation Contractors23821021,8405.7%$114,450$91,490 to $144,780
Plumbing, Heating, and Air-Conditioning Contractors23822021,6805.7%$109,150$93,220 to $137,820
Architectural, Engineering, and Related Services54130011,6903.1%$132,020$103,960 to $167,260
Engineering Services5413309,8702.6%$132,660$104,610 to $169,320
Power and Communication Line and Related Structures Construction2371308,7802.3%$119,210$97,130 to $153,920
Electric Power Generation, Transmission and Distribution2211002,7700.7%$135,750$119,160 to $167,200
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance8113004500.1%$120,510$102,710 to $149,710
Facilities Support Services5612002400.1%$127,620$108,380 to $175,120
Computer Systems Design and Related Services5415002000.1%$143,670$112,510 to $173,950
Testing Laboratories and Services541380800.0%$124,350$90,240 to $152,770

These national industry rows cover privately owned establishments. Industry names are exact BLS NAICS titles. Industries overlap, so shares do not sum to 100%. An industry row does not mean the employer runs data centers.

Pay in target metros

VP of Data Center Construction pay in target metros, BLS, May 2025
Metro areaMedianP25 to P75EmploymentLocation quotient
Washington-Arlington-Alexandria, DC-VA-MD-WV$129,650$104,010 to $162,4106,6300.86
Dallas-Fort Worth-Arlington, TX$103,550$81,000 to $133,03017,1101.73
Phoenix-Mesa-Chandler, AZ$118,350$99,900 to $137,3108,1701.41
Atlanta-Sandy Springs-Roswell, GA$119,590$92,970 to $150,4607,4701.06
Columbus, OH$105,200$90,850 to $129,9104,0001.48
Chicago-Naperville-Elgin, IL-IN$117,280$82,330 to $151,65013,8501.25
San Jose-Sunnyvale-Santa Clara, CA$163,040$124,940 to $200,8701,8500.67
Portland-Vancouver-Hillsboro, OR-WA$146,740$109,290 to $175,3602,6900.91

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Highest and lowest paying metros

Ranked by published median annual wage among 382 metro areas with an exact median.

Top 10 metros by median, BLS, May 2025
RankMetro areaMedianEmploymentLocation quotient
1San Francisco-Oakland-Fremont, CA$166,0305,1600.89
2San Jose-Sunnyvale-Santa Clara, CA$163,0401,8500.67
3Mount Vernon-Anacortes, WA$159,8601100.87
4Seattle-Tacoma-Bellevue, WA$159,4304,0100.78
5New York-Newark-Jersey City, NY-NJ$158,00012,1200.52
6Bellingham, WA$156,5802100.92
7Boston-Cambridge-Newton, MA-NH$156,4707,5701.14
8Longview-Kelso, WA$154,300600.57
9Kiryas Joel-Poughkeepsie-Newburgh, NY$152,1003100.47
10Wenatchee-East Wenatchee, WA$150,780600.46
Bottom 10 metros by median, BLS, May 2025
RankMetro areaMedianEmploymentLocation quotient
373Tyler, TX$79,7703001.07
374Dothan, AL$79,3201801.23
375Charleston, WV$79,0501900.73
376San Juan-Bayamon-Caguas, PR$77,9905100.3
377Rome, GA$77,960500.44
378Gadsden, AL$75,210700.87
379Hot Springs, AR$74,700300.35
380Mayaguez, PR$72,800400.28
381Ponce, PR$72,420500.3
382Aguadilla, PR$71,510400.34

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Where pay is highest relative to local wages

This compares the occupation's median with the all-occupations median in the same metro and on the same annual basis. It does not adjust for living costs. Only exact published medians are ranked. A top-coded lower bound cannot establish an exact rank.

Leading metros by occupation median divided by local all-occupations median, BLS, May 2025
MetroOccupation medianAll-occupations medianRatioEmploymentLocation quotient
Wenatchee-East Wenatchee, WA$150,780$49,2903.06 times600.46
Kiryas Joel-Poughkeepsie-Newburgh, NY$152,100$50,9902.98 times3100.47
Yakima, WA$139,480$47,8102.92 times600.24
El Centro, CA$130,630$45,1402.89 times600.38
Mayaguez, PR$72,800$25,2702.88 times400.28
Vineland, NJ$133,920$48,1902.78 times900.57
Hattiesburg, MS$103,940$37,7502.75 times800.53
Sumter, SC$117,490$42,8902.74 times901.04
Bellingham, WA$156,580$57,8202.71 times2100.92
Aguadilla, PR$71,510$26,4802.70 times400.34
Bakersfield-Delano, CA$127,890$47,4702.69 times7200.87
Ponce, PR$72,420$26,9402.69 times500.3
Longview-Kelso, WA$154,300$57,4202.69 times600.57
Mount Vernon-Anacortes, WA$159,860$59,5902.68 times1100.87
Monroe, LA$101,750$38,1502.67 times1400.65
Atlantic City-Hammonton, NJ$126,700$47,5202.67 times3100.76
San Juan-Bayamon-Caguas, PR$77,990$29,4402.65 times5100.3
Rochester, NY$134,940$51,2102.64 times4900.4
Kennewick-Richland, WA$149,900$57,2902.62 times3201.01
Kokomo, IN$127,930$48,9802.61 times400.42
Rapid City, SD$120,560$46,2702.61 times2401.3
Riverside-San Bernardino-Ontario, CA$126,040$48,4002.60 times3,4500.82
Florence, SC$113,110$43,5202.60 times1100.48
Miami-Fort Lauderdale-West Palm Beach, FL$126,110$48,6402.59 timesNot published by BLSNot published by BLS
Kingsport-Bristol, TN-VA$116,980$45,2402.59 times2800.94

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Source: BLS OEWS BLS, May 2025, SOC 11-9021 and SOC 00-0000, matching metro areas. The ratio is our arithmetic on those published medians, not a BLS statistic.

Change since the prior BLS release

Median annual wage, same SOC and same BLS area code, two releases
Reference periodMedian
May 2024$106,980
May 2025$114,990
Difference+$8,010 (+7.5%)

Two published BLS values, shown as released. Not annualized, not adjusted for inflation, and BLS metro boundaries and survey panels can differ between releases.

What is inside the BLS pay figure

For construction and commissioning hires, separate expense reimbursements and overtime from straight-time pay. Check a project bonus on its actual terms. Guaranteed pay and production incentives count in BLS wages; discretionary nonproduction bonuses do not.

Pay components for Executive Leadership roles against the BLS wage definition
ComponentIn the BLS figure?Note
Base rate and guaranteed payIncludedBLS counts the "base rate" and "guaranteed pay".
Production and incentive payIncludedBLS counts "incentive pay including commissions and production bonuses".
On-call payIncludedBLS lists "on-call pay" and "hazardous-duty pay" as wages.
Overtime pay matters hereLeft outBLS excludes "overtime pay". Straight-time pay only.
Shift differentialsLeft outBLS excludes "shift differentials", so night and weekend premiums are not in the figure.
Project-completion and discretionary bonuses matters hereDepends on the termsGuaranteed pay and production incentives are included. Discretionary nonproduction bonuses are excluded. Check how the payment is defined.
Per diem, travel and relocation matters hereLeft outBLS does not name these as wages. They are expense reimbursements and are not in the figure.
Benefits and employer costsLeft outBLS excludes "employer costs for supplementary benefits".

Recruiter's read

Qualitative, not from BLS data.

VP of Data Center Construction candidates are usually screened on delivered a multi-campus program; GC procurement strategy; owner-side or GC P&L.

We usually find them through developers; hyperscalers; GC executives. We contact working people directly rather than relying on job applications.

Questions

What is the median pay for VP of Data Center Construction?

The BLS median annual wage for Construction Managers nationally is $114,990 (BLS, May 2025).

What range do most VP of Data Center Construction earn?

Per BLS, the middle half earned $88,550 to $151,640, and 10% earned less than $69,690.

Is this the exact job title?

Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.

How many people are employed in this occupation?

BLS estimates 380,360 jobs nationally in Construction Managers across all industries.

What do BLS wages leave out?

They leave out overtime, shift differentials, discretionary bonus, benefits, per diem and relocation. Base pay, guaranteed pay, on-call pay and production-based incentive pay are included.

Hiring Market Brief

A one-page brief for VP of Data Center Construction: BLS pay, mapping and caveats.

Step 1 of 2

Hiring VP of Data Center Construction?

Pay is one input. Scope, license and travel decide whether the person says yes.

Start a Search Check an offer Browse jobs

Related

Download the underlying data (JSON)

What the published rows say about VP of Data Center Construction pay in the United States

VP of Data Center Construction pay in the United States is represented here by Construction Managers, SOC 11-9021, in the May 2025 OEWS release. For VP of Data Center Construction pay in the United States, data Center Headhunters uses the broader crosswalk for this title; the occupation row, rather than a separate survey of VP of Data Center Construction, supplies the figures on this page. For VP of Data Center Construction pay in the United States, the published annual median is $114,990 and the middle-half endpoints are $88,550 and $151,640.

The VP of Data Center Construction pay in the United States middle-half band spans $63,090 on the annual basis. For VP of Data Center Construction pay in the United States, its lower quarter-to-median distance is $26,440, compared with $36,650 from the median to the upper quarter. For VP of Data Center Construction pay in the United States, the upper interval is at least as wide as the other interval in this row. For VP of Data Center Construction pay in the United States, for an offer against this VP of Data Center Construction crosswalk, these are published reference points, not experience grades; the width does not establish a reason for differences between individual workers.

VP of Data Center Construction pay in the United States can also be compared with Dallas-Fort Worth-Arlington, TX, where the annual median for Construction Managers is $103,550 in May 2025. For VP of Data Center Construction pay in the United States, this comparison metro is selected by published occupation employment, not by a national geographic distance. For VP of Data Center Construction pay in the United States, the VP of Data Center Construction crosswalk comparison differs by $11,440 from the the United States median.

VP of Data Center Construction pay in the United States can also be compared with Houston-Pasadena-The Woodlands, TX, where the annual median for Construction Managers is $103,530 in May 2025. For VP of Data Center Construction pay in the United States, this comparison metro is selected by published occupation employment, not by a national geographic distance. For VP of Data Center Construction pay in the United States, the VP of Data Center Construction crosswalk comparison differs by $11,460 from the the United States median.

VP of Data Center Construction pay in the United States has no local industry-by-occupation wage breakdown in the loaded OEWS rows. For VP of Data Center Construction pay in the United States, the highest published national industry medians loaded for SOC 11-9021 are Semiconductor and Other Electronic Component Manufacturing at $211,260 and Oil and Gas Extraction at $196,880. For VP of Data Center Construction pay in the United States, these May 2025 observations describe the national Construction Managers occupation in those industries, not the pay of data center employers in the United States; they cannot support a local industry ranking.

The VP of Data Center Construction pay in the United States matched median changed from $106,980 in May 2024 to $114,990 in May 2025, a difference of $8,010 up. For VP of Data Center Construction pay in the United States, both observations use SOC 11-9021, area code 99 and the same annual wage basis. For VP of Data Center Construction pay in the United States, this VP of Data Center Construction comparison reports the released values without adjusting for inflation, annualizing the change or attributing it to a particular employer.

VP of Data Center Construction pay in the United States uses the OEWS straight-time wage definition, not a complete cost-to-employ budget. For VP of Data Center Construction pay in the United States, for an offer mapped to Construction Managers, separate overtime, shift differentials and expense reimbursements from the annual figures for the United States; BLS excludes those categories. For VP of Data Center Construction pay in the United States, on-call pay, guaranteed pay and production incentives are included under the wage definition. For VP of Data Center Construction pay in the United States, no VP of Data Center Construction-specific per diem, travel allowance or relocation amount is observed in this row, so this May 2025 page adds no dollar allowance on top.

Questions about VP of Data Center Construction pay in the United States

Which BLS row supports VP of Data Center Construction pay in the United States?

VP of Data Center Construction is mapped to SOC 11-9021, Construction Managers; the May 2025 the United States annual median is $114,990. The mapping is broader, not a separate survey of this niche title.

Does the the United States figure show all offer costs for VP of Data Center Construction?

VP of Data Center Construction pay in the United States uses straight-time OEWS wages. Overtime and shift differentials are excluded; on-call and guaranteed pay are included. No allowance for travel or relocation is added to this 11-9021 observation.

Nearest-area selection uses Census Gazetteer internal points, not road distance. Source: 2025 Census Gazetteer.

CallStart a SearchGet a free talent snapshotGet a free job description review