Data Center
Headhunters
Call 954-738-7918Start a Search

VP of Data Center Construction Salary in Farmington, NM

This is the Data Center Headhunters salary guide.

BLS does not measure VP of Data Center Construction as its own occupation, so this page uses Construction Managers (SOC 11-9021, broader occupation). The median annual wage in Farmington, NM was $102,780 (BLS, May 2025), and the middle half earned $79,790 to $135,240. That is $12,210 below the national median of $114,990.

This is what we do all day: recruit data center professionals.

Broader occupation

Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.

Farmington, NM

Median $102,780P10 $68,960P90 $166,750
Construction Managers, Farmington, NM, annual wages
PointAnnual wageMeaning
10th percentile$68,96010% of workers in this occupation and area earned less than this.
25th percentile$79,79025% earned less than this.
Median$102,780Half earned less, half earned more.
75th percentile$135,24075% earned less than this.
90th percentile$166,75090% earned less than this.
Mean$113,760Average wage.

United States

Median $114,990P10 $69,690P90 $189,440
Construction Managers, United States, annual wages
PointAnnual wageMeaning
10th percentile$69,69010% of workers in this occupation and area earned less than this.
25th percentile$88,55025% earned less than this.
Median$114,990Half earned less, half earned more.
75th percentile$151,64075% earned less than this.
90th percentile$189,44090% earned less than this.
Mean$124,360Average wage.

What BLS wages cover: OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. These are straight-time gross wages, not pure base salary or total compensation. Discuss per diem, travel and relocation separately. BLS pay-term definitions.

Employment: 190. Location quotient: 1.6.

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. SOC 11-9021 Construction Managers, Farmington, NM. Download metropolitan data (ZIP).

Pay relative to all occupations

Median for this occupation divided by the all-occupations median, same area, same annual basis
MeasureValue
This occupation, median$102,780
All occupations (SOC 00-0000), median$45,820
Relative wage2.24 times

A ratio of 1.00 means the same median as all workers in the area. It is arithmetic on two BLS medians, not a BLS statistic.

Change since the prior BLS release

Median annual wage, same SOC and same BLS area code, two releases
Reference periodMedian
May 2024$93,030
May 2025$102,780
Difference+$9,750 (+10.5%)

Two published BLS values, shown as released. Not annualized, not adjusted for inflation, and BLS metro boundaries and survey panels can differ between releases.

What is inside the BLS pay figure

For construction and commissioning hires, separate expense reimbursements and overtime from straight-time pay. Check a project bonus on its actual terms. Guaranteed pay and production incentives count in BLS wages; discretionary nonproduction bonuses do not.

Pay components for Executive Leadership roles against the BLS wage definition
ComponentIn the BLS figure?Note
Base rate and guaranteed payIncludedBLS counts the "base rate" and "guaranteed pay".
Production and incentive payIncludedBLS counts "incentive pay including commissions and production bonuses".
On-call waiting or availability payLeft outBLS excludes payment for time spent awaiting a call to work, not ordinary wages for hours actually worked. BLS on-call pay definition.
Overtime pay matters hereLeft outBLS excludes "overtime pay". Straight-time pay only.
Shift differentialsLeft outBLS excludes "shift differentials", so night and weekend premiums are not in the figure.
Project-completion and discretionary bonuses matters hereDepends on the termsGuaranteed pay and production incentives are included. Discretionary nonproduction bonuses are excluded. Check how the payment is defined.
Per diem, travel and relocation matters hereLeft outBLS does not name these as wages. They are expense reimbursements and are not in the figure.
Benefits and employer costsLeft outBLS excludes "employer costs for supplementary benefits".

Nearby and other areas

Hiring Market Brief

A one-page brief for VP of Data Center Construction in Farmington, NM: BLS pay, mapping and caveats.

Step 1 of 2

Hiring VP of Data Center Construction in Farmington, NM?

Pay is one input. Scope, license and travel decide whether the person says yes.

Start a Search Check an offer Browse jobs

Related

Download the underlying data (JSON)

CallStart a SearchGet a free talent snapshotGet a free job description review