Data Center
Headhunters
Call 954-738-7918Start a Search

Equipment Procurement Manager, Long-Lead / OFCI Salary

This is the Data Center Headhunters salary guide.

BLS does not measure Equipment Procurement Manager, Long-Lead / OFCI as its own occupation, so this page uses Purchasing Managers (SOC 11-3061, broader occupation). The median annual wage in the United States was $148,080 (BLS, May 2025), and the middle half earned $115,550 to $182,270.

This is what we do all day: recruit data center professionals.

Broader occupation

Purchasing Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.

National pay range

Median $148,080P10 $92,490P90 $223,280
Purchasing Managers, United States, annual wages
PointAnnual wageMeaning
10th percentile$92,49010% of workers in this occupation and area earned less than this.
25th percentile$115,55025% earned less than this.
Median$148,080Half earned less, half earned more.
75th percentile$182,27075% earned less than this.
90th percentile$223,28090% earned less than this.
Mean$156,360Average wage.

What BLS wages cover: OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. These are straight-time gross wages, not pure base salary or total compensation. Discuss per diem, travel and relocation separately. BLS pay-term definitions.

Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. SOC 11-3061 Purchasing Managers, United States. Download national data (ZIP).

Pay relative to all occupations

Median for this occupation divided by the all-occupations median, same area, same annual basis
MeasureValue
This occupation, median$148,080
All occupations (SOC 00-0000), median$50,980
Relative wage2.90 times

A ratio of 1.00 means the same median as all workers in the area. It is arithmetic on two BLS medians, not a BLS statistic.

Pay in industries that hire this occupation

National employment and pay by BLS industry, BLS, May 2025
Industry (BLS name)NAICSEmploymentShare of occupationMedianP25 to P75
Computer Systems Design and Related Services5415001,5601.9%$161,380$128,440 to $199,950
Architectural, Engineering, and Related Services5413001,4201.7%$157,250$128,490 to $200,100
Professional and Commercial Equipment and Supplies Merchant Wholesalers4234001,4201.7%$140,080$107,100 to $178,160
Engineering Services5413301,3101.6%$156,760$128,820 to $199,820
Building Equipment Contractors2382006200.7%$112,530$93,650 to $156,100
Nonresidential Building Construction2362004900.6%$144,870$98,810 to $196,380
Electric Power Generation, Transmission and Distribution2211004400.5%$153,390$129,630 to $177,790
Other Electrical Equipment and Component Manufacturing3359003200.4%$132,730$109,690 to $172,100
Electrical Contractors and Other Wiring Installation Contractors2382103000.4%$133,930$96,470 to $169,420
Plumbing, Heating, and Air-Conditioning Contractors2382202600.3%$107,060$93,930 to $130,070
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services5182002000.2%$181,590$142,790 to $218,020
Computer and Peripheral Equipment Manufacturing3341001800.2%$178,520$134,860 to $219,720
Utility System Construction2371001200.1%$133,120$101,030 to $157,720
Testing Laboratories and Services541380900.1%$173,400$129,580 to $204,200
Facilities Support Services561200800.1%$126,280$96,170 to $175,170
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance811300800.1%$108,170$96,000 to $127,970
Power and Communication Line and Related Structures Construction237130700.1%$139,450$110,720 to $200,680

These national industry rows cover privately owned establishments. Industry names are exact BLS NAICS titles. Industries overlap, so shares do not sum to 100%. An industry row does not mean the employer runs data centers.

Pay in target metros

Equipment Procurement Manager, Long-Lead / OFCI pay in target metros, BLS, May 2025
Metro areaMedianP25 to P75EmploymentLocation quotient
Washington-Arlington-Alexandria, DC-VA-MD-WV$172,150$156,730 to $195,1904,1802.46
Dallas-Fort Worth-Arlington, TX$137,820$108,900 to $170,2403,4001.55
Phoenix-Mesa-Chandler, AZ$140,170$114,390 to $174,6901,2700.99
Atlanta-Sandy Springs-Roswell, GA$165,910$128,840 to $211,3402,5901.65
Columbus, OH$141,490$113,300 to $178,8905600.93
Chicago-Naperville-Elgin, IL-IN$155,080$128,970 to $185,2303,2501.33
San Jose-Sunnyvale-Santa Clara, CA$198,980$165,210 to $257,0307001.13
Portland-Vancouver-Hillsboro, OR-WA$149,030$117,280 to $177,1007401.13

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Highest and lowest paying metros

Ranked by published median annual wage among 219 metro areas with an exact median.

Top 10 metros by median, BLS, May 2025
RankMetro areaMedianEmploymentLocation quotient
1San Jose-Sunnyvale-Santa Clara, CA$198,9807001.13
2Trenton-Princeton, NJ$180,3403302.53
3Denver-Aurora-Centennial, CO$180,0009801.12
4Fayetteville-Springdale-Rogers, AR$176,3004102.74
5Boston-Cambridge-Newton, MA-NH$174,6401,9401.32
6Peoria, IL$174,4302102.37
7Washington-Arlington-Alexandria, DC-VA-MD-WV$172,1504,1802.46
8New York-Newark-Jersey City, NY-NJ$171,8107,3701.43
9Rochester, MN$171,340801.15
10Fort Collins-Loveland, CO$171,280700.78
Bottom 10 metros by median, BLS, May 2025
RankMetro areaMedianEmploymentLocation quotient
210Lincoln, NE$106,080900.87
211Odessa, TX$101,870300.77
212McAllen-Edinburg-Mission, TX$101,670800.49
213Niles, MI$100,890401.26
214Brownsville-Harlingen, TX$98,720500.53
215Jonesboro, AR$95,290401.21
216Lafayette, LA$93,950300.35
217Tallahassee, FL$93,910700.69
218Jackson, MS$86,690800.57
219San Juan-Bayamon-Caguas, PR$86,6502100.56

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Where pay is highest relative to local wages

This compares the occupation's median with the all-occupations median in the same metro and on the same annual basis. It does not adjust for living costs. Only exact published medians are ranked. A top-coded lower bound cannot establish an exact rank.

Leading metros by occupation median divided by local all-occupations median, BLS, May 2025
MetroOccupation medianAll-occupations medianRatioEmploymentLocation quotient
Fayetteville-Springdale-Rogers, AR$176,300$46,6103.78 times4102.74
Peoria, IL$174,430$49,5903.52 times2102.37
Burlington, NC$152,870$44,0103.47 times300.95
Atlantic City-Hammonton, NJ$161,620$47,5203.40 times800.91
Salinas, CA$158,550$47,3803.35 times300.34
Memphis, TN-MS-AR$156,830$46,8903.34 times2400.72
Hagerstown-Martinsburg, MD-WV$156,730$47,4403.30 times500.79
Morgantown, WV$156,230$47,3503.30 times300.86
Wichita, KS$155,970$47,6303.27 times1600.97
Atlanta-Sandy Springs-Roswell, GA$165,910$51,1703.24 times2,5901.65
Athens-Clarke County, GA$133,630$41,2203.24 times300.58
Fayetteville, NC$147,370$45,6203.23 times300.47
Kansas City, MO-KS$161,910$50,8203.19 times6901.17
Wilmington, NC$145,730$45,8003.18 times600.58
Fort Smith, AR-OK$125,330$39,5603.17 times601.15
Rochester, NY$161,120$51,2103.15 times3501.31
Detroit-Warren-Dearborn, MI$163,660$52,0803.14 times1,4901.45
Binghamton, NY$154,610$49,4603.13 times400.76
Fort Collins-Loveland, CO$171,280$55,3103.10 times700.78
Springfield, MA$159,800$51,9303.08 times500.43
Palm Bay-Melbourne-Titusville, FL$150,530$49,0303.07 times1801.38
Erie, PA$135,580$44,4603.05 times400.63
Ann Arbor, MI$168,670$55,3803.05 times1301.12
Columbus, GA-AL$132,510$43,5403.04 times701.12
Davenport-Moline-Rock Island, IA-IL$147,600$48,5503.04 times1901.99

Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.

Source: BLS OEWS BLS, May 2025, SOC 11-3061 and SOC 00-0000, matching metro areas. The ratio is our arithmetic on those published medians, not a BLS statistic.

Change since the prior BLS release

Median annual wage, same SOC and same BLS area code, two releases
Reference periodMedian
May 2024$139,510
May 2025$148,080
Difference+$8,570 (+6.1%)

Two published BLS values, shown as released. Not annualized, not adjusted for inflation, and BLS metro boundaries and survey panels can differ between releases.

What is inside the BLS pay figure

For construction and commissioning hires, separate expense reimbursements and overtime from straight-time pay. Check a project bonus on its actual terms. Guaranteed pay and production incentives count in BLS wages; discretionary nonproduction bonuses do not.

Pay components for Supply Chain & Procurement roles against the BLS wage definition
ComponentIn the BLS figure?Note
Base rate and guaranteed payIncludedBLS counts the "base rate" and "guaranteed pay".
Production and incentive payIncludedBLS counts "incentive pay including commissions and production bonuses".
On-call waiting or availability payLeft outBLS excludes payment for time spent awaiting a call to work, not ordinary wages for hours actually worked. BLS on-call pay definition.
Overtime pay matters hereLeft outBLS excludes "overtime pay". Straight-time pay only.
Shift differentialsLeft outBLS excludes "shift differentials", so night and weekend premiums are not in the figure.
Project-completion and discretionary bonuses matters hereDepends on the termsGuaranteed pay and production incentives are included. Discretionary nonproduction bonuses are excluded. Check how the payment is defined.
Per diem, travel and relocation matters hereLeft outBLS does not name these as wages. They are expense reimbursements and are not in the figure.
Benefits and employer costsLeft outBLS excludes "employer costs for supplementary benefits".

Recruiter's read

Qualitative, not from BLS data.

Equipment Procurement Manager, Long-Lead / OFCI candidates are usually screened on oFCI tracking from PO to set; factory acceptance and witness test scheduling; delivery sequencing with the GC.

We usually find them through gCs; owner's rep firms; power and oil and gas EPCs. We contact working people directly rather than relying on job applications.

Questions

What is the median pay for Equipment Procurement Manager, Long-Lead / OFCI?

The BLS median annual wage for Purchasing Managers nationally is $148,080 (BLS, May 2025).

What range do most Equipment Procurement Manager, Long-Lead / OFCI earn?

Per BLS, the middle half earned $115,550 to $182,270, and 10% earned less than $92,490.

Is this the exact job title?

Purchasing Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.

How many people are employed in this occupation?

BLS estimates 84,320 jobs nationally in Purchasing Managers across all industries.

What do BLS wages leave out?

OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. Discuss per diem, travel and relocation separately.

Hiring Market Brief

A one-page brief for Equipment Procurement Manager, Long-Lead / OFCI: BLS pay, mapping and caveats.

Step 1 of 2

Hiring Equipment Procurement Manager, Long-Lead / OFCI?

Pay is one input. Scope, license and travel decide whether the person says yes.

Start a Search Check an offer Browse jobs

Related

Download the underlying data (JSON)

What the published rows say about Equipment Procurement Manager, Long-Lead / OFCI pay in the United States

Equipment Procurement Manager, Long-Lead / OFCI maps to Purchasing Managers, SOC 11-3061. For the United States, the May 2025 OEWS annual median is $148,080; the middle half runs from $115,550 to $182,270. This is a broader occupation, not a separate wage estimate for this exact job. BLS does not separate seniority titles that share this row. Define decision authority and the scope of the team or account before setting the offer. The occupation estimate does not separately price your site's responsibilities.

The middle-half spread is $66,720: $32,530 from the 25th percentile to the median and $34,190 from the median to the 75th. The upper interval is wider. Use these points to compare an offer, not to price a junior or senior hire. Percentiles are not experience bands, and this distribution alone does not explain why individual workers earn different amounts.

New York-Newark-Jersey City, NY-NJ reports a annual median of $171,810 for this occupation in May 2025. This metro is selected by published occupation employment, not geographic proximity to a national point. That is $23,730 above the United States's median.

Washington-Arlington-Alexandria, DC-VA-MD-WV reports a annual median of $172,150 for this occupation in May 2025. This metro is selected by published occupation employment, not geographic proximity to a national point. That is $24,070 above the United States's median.

The highest exact national industry medians in the loaded SOC 11-3061 rows are Oil and Gas Extraction at $208,290 and Oil and Gas Extraction at $208,290. These are May 2025 national occupation estimates, not local data center pay. The loaded data has no local industry-by-occupation breakdown, so it cannot rank industries within the United States.

The matched median moved from $139,510 in May 2024 to $148,080 in May 2025: $8,570 higher. Both rows use SOC 11-3061, area 99 and the same annual basis. This is not adjusted for inflation or annualized, and it does not attribute the change to a particular employer.

OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. This is neither pure base salary nor total compensation. Agree travel, per diem and relocation terms separately. No verified Equipment Procurement Manager, Long-Lead / OFCI-specific allowance is in this occupation row, so none is added to the figures.

Questions about Equipment Procurement Manager, Long-Lead / OFCI pay in the United States

Which BLS row supports Equipment Procurement Manager, Long-Lead / OFCI pay in the United States?

Equipment Procurement Manager, Long-Lead / OFCI maps to SOC 11-3061, Purchasing Managers. The May 2025 annual median for the United States is $148,080. The broader mapping is not a separate survey of this niche title.

Does the figure cover the whole offer for Equipment Procurement Manager, Long-Lead / OFCI?

OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. Travel and relocation terms still need their own discussion; this row supplies no separate allowance.

Nearest-area selection uses Census Gazetteer internal points, not road distance. Source: 2025 Census Gazetteer.

CallStart a SearchGet a free talent snapshotGet a free job description review