Traveling Project Manager, Data Center Salary
This is the Data Center Headhunters salary guide.
BLS does not measure Traveling Project Manager, Data Center as its own occupation, so this page uses Construction Managers (SOC 11-9021, broader occupation). The median annual wage in the United States was $114,990 (BLS, May 2025), and the middle half earned $88,550 to $151,640.
This is what we do all day: recruit data center professionals.
Broader occupation
Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.
National pay range
| Point | Annual wage | Meaning |
|---|---|---|
| 10th percentile | $69,690 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $88,550 | 25% earned less than this. |
| Median | $114,990 | Half earned less, half earned more. |
| 75th percentile | $151,640 | 75% earned less than this. |
| 90th percentile | $189,440 | 90% earned less than this. |
| Mean | $124,360 | Average wage. |
| Point | Hourly wage | Meaning |
|---|---|---|
| 10th percentile | $33.5 | 10% of workers in this occupation and area earned less than this. |
| 25th percentile | $42.57 | 25% earned less than this. |
| Median | $55.28 | Half earned less, half earned more. |
| 75th percentile | $72.91 | 75% earned less than this. |
| 90th percentile | $91.08 | 90% earned less than this. |
| Mean | $59.79 | Average wage. |
What BLS wages cover: OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. These are straight-time gross wages, not pure base salary or total compensation. Discuss per diem, travel and relocation separately. BLS pay-term definitions.
Source: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. SOC 11-9021 Construction Managers, United States. Download national data (ZIP).
Pay relative to all occupations
| Measure | Value |
|---|---|
| This occupation, median | $114,990 |
| All occupations (SOC 00-0000), median | $50,980 |
| Relative wage | 2.26 times |
A ratio of 1.00 means the same median as all workers in the area. It is arithmetic on two BLS medians, not a BLS statistic.
Pay in industries that hire this occupation
| Industry (BLS name) | NAICS | Employment | Share of occupation | Median | P25 to P75 |
|---|---|---|---|---|---|
| Nonresidential Building Construction | 236200 | 92,590 | 24.3% | $126,690 | $98,640 to $160,330 |
| Building Equipment Contractors | 238200 | 47,360 | 12.5% | $109,990 | $91,550 to $140,570 |
| Utility System Construction | 237100 | 24,680 | 6.5% | $120,440 | $96,810 to $153,320 |
| Electrical Contractors and Other Wiring Installation Contractors | 238210 | 21,840 | 5.7% | $114,450 | $91,490 to $144,780 |
| Plumbing, Heating, and Air-Conditioning Contractors | 238220 | 21,680 | 5.7% | $109,150 | $93,220 to $137,820 |
| Architectural, Engineering, and Related Services | 541300 | 11,690 | 3.1% | $132,020 | $103,960 to $167,260 |
| Engineering Services | 541330 | 9,870 | 2.6% | $132,660 | $104,610 to $169,320 |
| Power and Communication Line and Related Structures Construction | 237130 | 8,780 | 2.3% | $119,210 | $97,130 to $153,920 |
| Electric Power Generation, Transmission and Distribution | 221100 | 2,770 | 0.7% | $135,750 | $119,160 to $167,200 |
| Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance | 811300 | 450 | 0.1% | $120,510 | $102,710 to $149,710 |
| Facilities Support Services | 561200 | 240 | 0.1% | $127,620 | $108,380 to $175,120 |
| Computer Systems Design and Related Services | 541500 | 200 | 0.1% | $143,670 | $112,510 to $173,950 |
| Testing Laboratories and Services | 541380 | 80 | 0.0% | $124,350 | $90,240 to $152,770 |
These national industry rows cover privately owned establishments. Industry names are exact BLS NAICS titles. Industries overlap, so shares do not sum to 100%. An industry row does not mean the employer runs data centers.
Pay in target metros
| Metro area | Median | P25 to P75 | Employment | Location quotient |
|---|---|---|---|---|
| Washington-Arlington-Alexandria, DC-VA-MD-WV | $129,650 | $104,010 to $162,410 | 6,630 | 0.86 |
| Dallas-Fort Worth-Arlington, TX | $103,550 | $81,000 to $133,030 | 17,110 | 1.73 |
| Phoenix-Mesa-Chandler, AZ | $118,350 | $99,900 to $137,310 | 8,170 | 1.41 |
| Atlanta-Sandy Springs-Roswell, GA | $119,590 | $92,970 to $150,460 | 7,470 | 1.06 |
| Columbus, OH | $105,200 | $90,850 to $129,910 | 4,000 | 1.48 |
| Chicago-Naperville-Elgin, IL-IN | $117,280 | $82,330 to $151,650 | 13,850 | 1.25 |
| San Jose-Sunnyvale-Santa Clara, CA | $163,040 | $124,940 to $200,870 | 1,850 | 0.67 |
| Portland-Vancouver-Hillsboro, OR-WA | $146,740 | $109,290 to $175,360 | 2,690 | 0.91 |
Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.
Highest and lowest paying metros
Ranked by published median annual wage among 382 metro areas with an exact median.
| Rank | Metro area | Median | Employment | Location quotient |
|---|---|---|---|---|
| 1 | San Francisco-Oakland-Fremont, CA | $166,030 | 5,160 | 0.89 |
| 2 | San Jose-Sunnyvale-Santa Clara, CA | $163,040 | 1,850 | 0.67 |
| 3 | Mount Vernon-Anacortes, WA | $159,860 | 110 | 0.87 |
| 4 | Seattle-Tacoma-Bellevue, WA | $159,430 | 4,010 | 0.78 |
| 5 | New York-Newark-Jersey City, NY-NJ | $158,000 | 12,120 | 0.52 |
| 6 | Bellingham, WA | $156,580 | 210 | 0.92 |
| 7 | Boston-Cambridge-Newton, MA-NH | $156,470 | 7,570 | 1.14 |
| 8 | Longview-Kelso, WA | $154,300 | 60 | 0.57 |
| 9 | Kiryas Joel-Poughkeepsie-Newburgh, NY | $152,100 | 310 | 0.47 |
| 10 | Wenatchee-East Wenatchee, WA | $150,780 | 60 | 0.46 |
| Rank | Metro area | Median | Employment | Location quotient |
|---|---|---|---|---|
| 373 | Tyler, TX | $79,770 | 300 | 1.07 |
| 374 | Dothan, AL | $79,320 | 180 | 1.23 |
| 375 | Charleston, WV | $79,050 | 190 | 0.73 |
| 376 | San Juan-Bayamon-Caguas, PR | $77,990 | 510 | 0.3 |
| 377 | Rome, GA | $77,960 | 50 | 0.44 |
| 378 | Gadsden, AL | $75,210 | 70 | 0.87 |
| 379 | Hot Springs, AR | $74,700 | 30 | 0.35 |
| 380 | Mayaguez, PR | $72,800 | 40 | 0.28 |
| 381 | Ponce, PR | $72,420 | 50 | 0.3 |
| 382 | Aguadilla, PR | $71,510 | 40 | 0.34 |
Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.
Where pay is highest relative to local wages
This compares the occupation's median with the all-occupations median in the same metro and on the same annual basis. It does not adjust for living costs. Only exact published medians are ranked. A top-coded lower bound cannot establish an exact rank.
| Metro | Occupation median | All-occupations median | Ratio | Employment | Location quotient |
|---|---|---|---|---|---|
| Wenatchee-East Wenatchee, WA | $150,780 | $49,290 | 3.06 times | 60 | 0.46 |
| Kiryas Joel-Poughkeepsie-Newburgh, NY | $152,100 | $50,990 | 2.98 times | 310 | 0.47 |
| Yakima, WA | $139,480 | $47,810 | 2.92 times | 60 | 0.24 |
| El Centro, CA | $130,630 | $45,140 | 2.89 times | 60 | 0.38 |
| Mayaguez, PR | $72,800 | $25,270 | 2.88 times | 40 | 0.28 |
| Vineland, NJ | $133,920 | $48,190 | 2.78 times | 90 | 0.57 |
| Hattiesburg, MS | $103,940 | $37,750 | 2.75 times | 80 | 0.53 |
| Sumter, SC | $117,490 | $42,890 | 2.74 times | 90 | 1.04 |
| Bellingham, WA | $156,580 | $57,820 | 2.71 times | 210 | 0.92 |
| Aguadilla, PR | $71,510 | $26,480 | 2.70 times | 40 | 0.34 |
| Bakersfield-Delano, CA | $127,890 | $47,470 | 2.69 times | 720 | 0.87 |
| Ponce, PR | $72,420 | $26,940 | 2.69 times | 50 | 0.3 |
| Longview-Kelso, WA | $154,300 | $57,420 | 2.69 times | 60 | 0.57 |
| Mount Vernon-Anacortes, WA | $159,860 | $59,590 | 2.68 times | 110 | 0.87 |
| Monroe, LA | $101,750 | $38,150 | 2.67 times | 140 | 0.65 |
| Atlantic City-Hammonton, NJ | $126,700 | $47,520 | 2.67 times | 310 | 0.76 |
| San Juan-Bayamon-Caguas, PR | $77,990 | $29,440 | 2.65 times | 510 | 0.3 |
| Rochester, NY | $134,940 | $51,210 | 2.64 times | 490 | 0.4 |
| Kennewick-Richland, WA | $149,900 | $57,290 | 2.62 times | 320 | 1.01 |
| Kokomo, IN | $127,930 | $48,980 | 2.61 times | 40 | 0.42 |
| Rapid City, SD | $120,560 | $46,270 | 2.61 times | 240 | 1.3 |
| Riverside-San Bernardino-Ontario, CA | $126,040 | $48,400 | 2.60 times | 3,450 | 0.82 |
| Florence, SC | $113,110 | $43,520 | 2.60 times | 110 | 0.48 |
| Miami-Fort Lauderdale-West Palm Beach, FL | $126,110 | $48,640 | 2.59 times | Not published by BLS | Not published by BLS |
| Kingsport-Bristol, TN-VA | $116,980 | $45,240 | 2.59 times | 280 | 0.94 |
Location quotient measures job concentration, not pay. A value above 1 means the occupation makes up a larger share of local jobs than it does nationally. It says nothing about wages.
Source: BLS OEWS BLS, May 2025, SOC 11-9021 and SOC 00-0000, matching metro areas. The ratio is our arithmetic on those published medians, not a BLS statistic.
Change since the prior BLS release
| Reference period | Median |
|---|---|
| May 2024 | $106,980 |
| May 2025 | $114,990 |
| Difference | +$8,010 (+7.5%) |
Two published BLS values, shown as released. Not annualized, not adjusted for inflation, and BLS metro boundaries and survey panels can differ between releases.
Levels above and below this title
These are different jobs, not experience bands within one occupation. The figures are not a promised raise.
Project Manager, Data Center map to the same BLS occupation, so BLS shows one set of figures for the whole ladder. Level is not a BLS dimension.
What is inside the BLS pay figure
For construction and commissioning hires, separate expense reimbursements and overtime from straight-time pay. Check a project bonus on its actual terms. Guaranteed pay and production incentives count in BLS wages; discretionary nonproduction bonuses do not.
| Component | In the BLS figure? | Note |
|---|---|---|
| Base rate and guaranteed pay | Included | BLS counts the "base rate" and "guaranteed pay". |
| Production and incentive pay | Included | BLS counts "incentive pay including commissions and production bonuses". |
| On-call waiting or availability pay | Left out | BLS excludes payment for time spent awaiting a call to work, not ordinary wages for hours actually worked. BLS on-call pay definition. |
| Overtime pay matters here | Left out | BLS excludes "overtime pay". Straight-time pay only. |
| Shift differentials | Left out | BLS excludes "shift differentials", so night and weekend premiums are not in the figure. |
| Project-completion and discretionary bonuses matters here | Depends on the terms | Guaranteed pay and production incentives are included. Discretionary nonproduction bonuses are excluded. Check how the payment is defined. |
| Per diem, travel and relocation matters here | Left out | BLS does not name these as wages. They are expense reimbursements and are not in the figure. |
| Benefits and employer costs | Left out | BLS excludes "employer costs for supplementary benefits". |
Recruiter's read
Qualitative, not from BLS data.
Traveling Project Manager, Data Center candidates are usually screened on specialty and general contractors place project managers on remote campus builds for the duration of a phase.
We usually find them through [supported-related-title] Related posting observed: Traveling Project Manager, Mission Critical (careers-shawmut.icims.com job 6917). Mission-critical scope validated; the 'Data Center' qualifier is our specialization, not the posted wording. We contact working people directly rather than relying on job applications.
Questions
What is the median pay for Traveling Project Manager, Data Center?
The BLS median annual wage for Construction Managers nationally is $114,990 (BLS, May 2025).
What range do most Traveling Project Manager, Data Center earn?
Per BLS, the middle half earned $88,550 to $151,640, and 10% earned less than $69,690.
Is this the exact job title?
Construction Managers is a broader occupation based on the work described, not a separate data center wage series. BLS does not distinguish this title, experience level, shift, credentials or data center employers. Confirm the actual duties before using this comparison.
How many people are employed in this occupation?
BLS estimates 380,360 jobs nationally in Construction Managers across all industries.
What do BLS wages leave out?
OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. Discuss per diem, travel and relocation separately.
Hiring Market Brief
A one-page brief for Traveling Project Manager, Data Center: BLS pay, mapping and caveats.
Hiring Traveling Project Manager, Data Center?
Pay is one input. Scope, license and travel decide whether the person says yes.
Related
What the published rows say about Traveling Project Manager, Data Center pay in the United States
Traveling Project Manager, Data Center maps to Construction Managers, SOC 11-9021. For the United States, the May 2025 OEWS annual median is $114,990; the middle half runs from $88,550 to $151,640. This is a broader occupation, not a separate wage estimate for this exact job. BLS does not separate seniority titles that share this row. Before setting an offer, pin down who owns the field decisions and whether the hire travels. A shared occupation median cannot price that scope for you.
The middle-half spread is $63,090: $26,440 from the 25th percentile to the median and $36,650 from the median to the 75th. The upper interval is wider. Use these points to compare an offer, not to price a junior or senior hire. Percentiles are not experience bands, and this distribution alone does not explain why individual workers earn different amounts.
Dallas-Fort Worth-Arlington, TX reports a annual median of $103,550 for this occupation in May 2025. This metro is selected by published occupation employment, not geographic proximity to a national point. That is $11,440 below the United States's median.
Houston-Pasadena-The Woodlands, TX reports a annual median of $103,530 for this occupation in May 2025. This metro is selected by published occupation employment, not geographic proximity to a national point. That is $11,460 below the United States's median.
The highest exact national industry medians in the loaded SOC 11-9021 rows are Semiconductor and Other Electronic Component Manufacturing at $211,260 and Oil and Gas Extraction at $196,880. These are May 2025 national occupation estimates, not local data center pay. The loaded data has no local industry-by-occupation breakdown, so it cannot rank industries within the United States.
The matched median moved from $106,980 in May 2024 to $114,990 in May 2025: $8,010 higher. Both rows use SOC 11-9021, area 99 and the same annual basis. This is not adjusted for inflation or annualized, and it does not attribute the change to a particular employer.
OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. This is neither pure base salary nor total compensation. Agree travel, per diem and relocation terms separately. No verified Traveling Project Manager, Data Center-specific allowance is in this occupation row, so none is added to the figures.
Questions about Traveling Project Manager, Data Center pay in the United States
Which BLS row supports Traveling Project Manager, Data Center pay in the United States?
Traveling Project Manager, Data Center maps to SOC 11-9021, Construction Managers. The May 2025 annual median for the United States is $114,990. The broader mapping is not a separate survey of this niche title.
Does the figure cover the whole offer for Traveling Project Manager, Data Center?
OEWS includes base rates, guaranteed pay, commissions and production incentives. It excludes on-call waiting or availability pay, overtime, shift differentials, nonproduction bonuses and benefits. The on-call exclusion covers time awaiting a call to work, not ordinary wages for hours actually worked. Travel and relocation terms still need their own discussion; this row supplies no separate allowance.
- traveling project manager data center dallas fort worth arlington tx
- traveling project manager data center houston pasadena the woodlands tx
- traveling project manager data center
- traveling project manager data center
- methodology
Nearest-area selection uses Census Gazetteer internal points, not road distance. Source: 2025 Census Gazetteer.